Which of the following statements about challenges in operations management is FALSE?

Which of the following statements about challenges in operations management is FALSE?



A) Job specialization is giving way to empowered employees.
B) Local or national focus is giving way to global focus.
C) Sustainable production is giving way to a low-cost focus.
D) Rapid product development is partly the result of shorter product cycles.
E) The goal of mass customization is to produce customized products, whenever and wherever needed.

Answer: C

A cleaning company uses $10 of chemicals, $40 of labor, and $5 of misc. expenses for each house it cleans. After some quality complaints, the company has decided to increase its use of chemicals by 50%. By what percentage has multifactor productivity fallen?

A cleaning company uses $10 of chemicals, $40 of labor, and $5 of misc. expenses for each house it cleans. After some quality complaints, the company has decided to increase its use of chemicals by 50%. By what percentage has multifactor productivity fallen?



A) 0%
B) 8.3%
C) 25%
D) 50%
E) 16.7%


Answer: B

A cleaning company uses 10 lbs each of chemicals A, B and C for each house it cleans. After some quality complaints, the company has decided to increase its use of chemical A by an additional 10 lbs for each house. By what % has productivity (houses per pound of chemical) fallen?

A cleaning company uses 10 lbs each of chemicals A, B and C for each house it cleans. After some quality complaints, the company has decided to increase its use of chemical A by an additional 10 lbs for each house. By what % has productivity (houses per pound of chemical) fallen?



A) 0%
B) 10%
C) 15%
D) 25%
E) 33%


Answer: D

A small metal shop operates 10 hours each day, producing 100 parts/hour. If productivity were increased 20%, how many hours would the plant have to work to produce 1000 parts?

A small metal shop operates 10 hours each day, producing 100 parts/hour. If productivity were increased 20%, how many hours would the plant have to work to produce 1000 parts?



A) less than 2 hours
B) between 9 and 10 hours
C) between 2 and 6 hours
D) between 6 and 8 hours
E) between 8 and 9 hours


Answer: E

The service sector has lower productivity improvements than the manufacturing sector because:

The service sector has lower productivity improvements than the manufacturing sector because:



A) the service sector uses less skilled labor than manufacturing.
B) the quality of output is lower in services than manufacturing.
C) services usually are labor-intensive.
D) service sector productivity is hard to measure.
E) the service sector is often easy to mechanize and automate


Answer: C

Three commonly used productivity variables are:

Three commonly used productivity variables are:



A) quality, external elements, and precise units of measure.
B) labor, capital, and management.
C) technology, raw materials, and labor.
D) education, diet, and social overhead.
E) quality, efficiency, and low cost.


Answer: B

Which of the following is NOT true when explaining why productivity tends to be lower in the service sector than in the manufacturing sector?

Which of the following is NOT true when explaining why productivity tends to be lower in the service sector than in the manufacturing sector?




A) Services are typically labor-intensive.
B) Services are often difficult to evaluate for quality.
C) Services are often an intellectual task performed by professionals.
D) Services are difficult to automate.
E) Service operations are typically capital intensive.


Answer: E

Productivity can be improved by:

Productivity can be improved by:



A) increasing inputs while holding outputs steady.
B) decreasing outputs while holding inputs steady.
C) increasing inputs and outputs in the same proportion.
D) decreasing inputs while holding outputs steady.
E) none of the above.


Answer: D

Which of the following nets the largest productivity improvement?

Which of the following nets the largest productivity improvement?



A) increase output 15%
B) decrease input 15%
C) increase both output and input by 5%
D) increase output 10%, decrease input 3%
E) decrease input 10%, increase output 3%


Answer: B

Productivity measurement is complicated by:

Productivity measurement is complicated by:



A) the competition's output.
B) the fact that precise units of measure are often unavailable.
C) stable quality.
D) the workforce size.
E) the type of equipment used.


Answer: B

The Dulac Box plant produces 500 cypress packing boxes in two 10-hour shifts. Due to higher demand, they have decided to operate three 8-hour shifts instead. They are now able to produce 600 boxes per day. What has happened to productivity?

The Dulac Box plant produces 500 cypress packing boxes in two 10-hour shifts. Due to higher demand, they have decided to operate three 8-hour shifts instead. They are now able to produce 600 boxes per day. What has happened to productivity?



A) It has not changed.
B) It has increased by 37.5 boxes/hr.
C) It has increased by 20%.
D) It has decreased by 8.3%.
E) It has decreased by 9.1%.


Answer: A

The Dulac Box plant works two 8-hour shifts each day. In the past, 500 cypress packing boxes were produced by the end of each day. The use of new technology has enabled them to increase productivity by 30%. Productivity is now approximately:

The Dulac Box plant works two 8-hour shifts each day. In the past, 500 cypress packing boxes were produced by the end of each day. The use of new technology has enabled them to increase productivity by 30%. Productivity is now approximately:



A) 32.5 boxes/hr.
B) 40.6 boxes/hr.
C) 62.5 boxes/hr.
D) 81.25 boxes/hr.
E) 300 boxes/hr.


Answer: B