Two phases that produce the greatest risk reduction
A. Operations and support
B. Integrations and production
C. Risk assessment and mitigation
D. Concept exploration and advanced development
Answer: D
Learn More :
Qualitative
- The most valuable product from a Pareto analysis of the delays caused by breakdowns of machines in an assembly line would be to:
- Sub activities of requirements elicitation are identification of relevant requirements sources, elicitation of existing requirements and
- Validation answers "did we build it right" T/F
- The three stages of the systems engineering life cycle model are as follows
- The principle objectives of the concept development stage are to
- Program risk is greatest during the production phase T/F
- What is a benefit of configuration management?
- Is it possible for a product to pass system verification and fail validation T/F
- If mature technologies and tools exist, what is most likely the probability of failure of the system being designed?
- In a process FMEA, there were multiple problems occurring from improper machine set up, what should you do?
- Which field is aimed at deciding between jobs that should be assigned to humans and jobs that should be assigned to machines?
- The process of determining whether a model or simulation implementation is transformed from one phase of development to another in a way that is consistent with the documented requirements and specifications
- What topic analyzes the likelihood and severity of a loss?
- Requirements analysis in general can be expressed in three different ways, often called the three P's. Which is not a P
- A G/N/2/4 queue always has
- Simulation experiments modeling a nonterminating system are often biased by the empty and idle start up conditions. Which is NOT a viable method to deal with initial condition bias
- Which of the following system would best be modeled as a nonterminating system?
- In an entity-relationship diagram for relational data-base, the relationship between product record and the part family record
- In using root cause analysis techniques to determine problems, which tool is not typically used?
- The quality management principles listed in ISO 9000:2000 include which of the following
- Which of the following is not a benefit of OEE?
- The main objective of Six Sigma method is to
- For a certain lifting task, the NIOSH lifting equation was applied to determine the recommended weight limit (RWL). The task involved lifting a load of 24.
- The basic unit of measurement in MTM-1 is