Which of the following statements regarding the gross material requirements plan is TRUE?
A) It shows total demand for an item.
B) It shows when an item must be ordered from a supplier or when production must be started.
C) It combines a master production schedule with the time-phased schedule.
D) It requires several inputs, including an accurate bill of material.
E) All of the above are true.
Answer: E