Which of the following is NOT tracked by scheduling optimization systems used in retail stores?
A) cars parked in the parking lot
B) individual store sales
C) transactions
D) units sold
E) customer traffic
Answer: A) cars parked in the parking lot
Learn More :
Management Chapter 15
- Which of the following is TRUE regarding services scheduling?
- A recent advance in short-term scheduling that makes use of expert systems and simulation in solving dynamic scheduling problems is:
- Which of the following is a limitation of rules-based dispatching systems?
- When a set of jobs must pass through two workstations whose sequence is fixed, ________ is the sequencing rule most commonly applied.
- What does the use of the shortest processing time sequencing rule generally produce?
- Which of the following is an advantage of the FCFS dispatching rule when used in services?
- What is the priority rule that sequences jobs using the smallest ratio of due date from today to processing time?
- Which critical ratio value implies that a job is already late?
- Eight jobs have been sequenced at a single work center. Total processing time for the eight jobs is 34 hours, and total flow time for the sequence is 85 hours. For this schedule, utilization is ________ and the average number of jobs in the system is ________.
- Average completion time for a schedule sequence at a work center is the ratio of:
- Which of the following dispatching rules tends to minimize job flow time?
- Flow time represents the time:
- Sequencing (or dispatching):
- Which of the following dispatching rules ordinarily gives the best results when the criterion is lowest time for completion of the full sequence of jobs?
- Orders are processed in the sequence in which they arrive if (the) ________ rule sequences the jobs.
- Using LPT priority would result in what sequence for Jobs A, B, C, and D if their process times are 4, 6, 5, and 2 respectively?
- EDD stands for what?
- If an assignment problem consists of 5 workers and 4 projects:
- If an assignment problem consists of 6 workers and 7 projects:
- What is a method of input-output control that uses a system of cards to limit the amount of work at a work center and also to control lead time and monitor backlog?
- Which of the following is an aid used to monitor jobs in progress?
- If job 5 takes 3, 4 or 5 hours to be completed by workers A, B, and C, respectively, what would the row values for job 5 be after performing Step 1A of the assignment method?
- There are two jobs to be assigned to two workers. The profit for worker A on job 1 is $5 and on job 2 is $8. The profit for worker B on job 1 is $10 and on job 2 is $12. How should the work be divided using the assignment method?
- What is a scheduling technique used to achieve an optimum, one-to-one matching of tasks and resources?